19 Nov
2014
19 Nov
'14
9:11 p.m.
Our UPS doesn't have SNMP and I have 2 PDUs with SNMP on each UPS.
So I figured if I calculate out 80% Amps for the UPS, I can add PDU1 and PDU2 together to get if I am > or = 80% usage.
I'll just have to set my restrictions on Amperage lower for PUD2 and manuyally add them in my head. -- Sincerely, Joshua Hopper, A+ CE Network Administrator
420 3rd Ave NW Hickory NC 28601 Office: 828-449-1839x2160 | Cell: 828-855-7565